{"id":975,"date":"2025-12-06T03:42:45","date_gmt":"2025-12-06T03:42:45","guid":{"rendered":"https:\/\/microvibenews.com\/?p=975"},"modified":"2025-12-06T03:42:45","modified_gmt":"2025-12-06T03:42:45","slug":"r311m-and-counting-but-this-limpopo-taxi-rank-has-never-opened","status":"publish","type":"post","link":"https:\/\/microvibenews.com\/?p=975","title":{"rendered":"R311m and counting but this Limpopo taxi rank has never opened"},"content":{"rendered":"<p><\/p>\n<div id=\"textFreeArticle\">\n<p>Exactly three years ago, we reported how R275 million had been spent on a taxi rank in Limpopo which had never opened. Construction started in 2011 on the Thohoyandou taxi rank. The bill now stands at R311 million. It has still not opened.<img loading=\"lazy\" decoding=\"async\" id=\"gu_counter\" class=\"leave\" src=\"https:\/\/republish.groundup.org.za\/counter\/hit\/16164\/r311-million-and-counting-but-this-limpopo-taxi-rank-has-never-opened\/\" alt=\"\" width=\"1\" height=\"1\"\/><\/p>\n<p>In October, Premier Phophi Ramathuba announced at a press briefing at the taxi rank that a further R47 million will be allocated.<\/p>\n<p>The new contractor was given eight months to complete the project.<\/p>\n<div class=\"visible-sm-block visible-xs-block m1010\">\n<div class=\"ad-container-wrapper\">\n<p>ADVERTISEMENT<\/p>\n<p>CONTINUE READING BELOW<\/p>\n<\/div>\n<\/div>\n<p>When GroundUp visited the site last week, there was no sign that work was about to commence.<\/p>\n<p>After initial construction in 2013, which included a three-storey retail and office block, \u201cstructural defects\u201d were found in 2014. Remedial work was then carried out between March 2017 and July 2018, according to Tidimalo Chuene, spokesperson for the Limpopo Department of Transport and Community Safety.<\/p>\n<p>But \u201coverloaded pile foundations and inadequate reinforcement\u201d had \u201crendered the building non-compliant with design codes\u201d.<\/p>\n<p>The project was also delayed by a court case that has been ongoing since 2018. The department took the implementing agent, Intersite Property Management Services, and Mnjiya Consulting Engineers to court.<\/p>\n<p>Maanda Tshikovhi, a taxi driver, says he was still in high school when construction of the rank began.<\/p>\n<p>\u201cThe current make-shift taxi rank [at Mvusuludzo] we are using is so small and often overcrowded. We really need this new taxi rank to open, but they must first make sure that it is safe to use, as we do not want to die,\u201d he said.<\/p>\n<p>\u00a9 2025 GroundUp. This article was first published here.<\/p>\n<p><em>Follow Moneyweb\u2019s in-depth finance and business news on WhatsApp here.<\/em><\/p>\n<\/p><\/div>\n<p><script data-cfasync=\"false\">\n            !function(f,b,e,v,n,t,s)\n            {if(f.fbq)return;n=f.fbq=function(){n.callMethod?\n                n.callMethod.apply(n,arguments):n.queue.push(arguments)};\n                if(!f._fbq)f._fbq=n;n.push=n;n.loaded=!0;n.version='2.0';\n                n.queue=[];t=b.createElement(e);t.async=!0;\n                t.src=v;s=b.getElementsByTagName(e)[0];\n                s.parentNode.insertBefore(t,s)}(window, document,'script',\n                'https:\/\/connect.facebook.net\/en_US\/fbevents.js');\n            fbq('init', '779812924991616');\n            fbq('track', 'PageView');\n        <\/script>#R311m #counting #Limpopo #taxi #rank #opened<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Exactly three years ago, we re&hellip; <\/p>\n","protected":false},"author":1,"featured_media":976,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[818,819,822,817,821,820],"_links":{"self":[{"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/posts\/975"}],"collection":[{"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/microvibenews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=975"}],"version-history":[{"count":0,"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/posts\/975\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/media\/976"}],"wp:attachment":[{"href":"https:\/\/microvibenews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=975"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microvibenews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=975"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microvibenews.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=975"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}