{"id":31329,"date":"2026-06-15T20:17:30","date_gmt":"2026-06-15T20:17:30","guid":{"rendered":"https:\/\/microvibenews.com\/?p=31329"},"modified":"2026-06-15T20:17:30","modified_gmt":"2026-06-15T20:17:30","slug":"low-housing-delivery-risks-becoming-entrenched-daily-business","status":"publish","type":"post","link":"https:\/\/microvibenews.com\/?p=31329","title":{"rendered":"Low housing delivery risks becoming &#8216;entrenched&#8217; \u2013 Daily Business"},"content":{"rendered":"<p><\/p>\n<div>\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2022\/05\/Construction-housebuilding.png\" alt=\"Construction, housebuilding\" class=\"wp-image-131785 lazyload\"\/><img loading=\"lazy\" fetchpriority=\"high\" decoding=\"async\" width=\"794\" height=\"512\" src=\"https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2022\/05\/Construction-housebuilding.png\" alt=\"Construction, housebuilding\" class=\"wp-image-131785 lazyload\" srcset=\"https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2022\/05\/Construction-housebuilding.png 794w, https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2022\/05\/Construction-housebuilding-300x193.png 300w, https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2022\/05\/Construction-housebuilding-768x495.png 768w, https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2022\/05\/Construction-housebuilding-600x387.png 600w\" sizes=\"(max-width: 794px) 100vw, 794px\"\/><figcaption class=\"wp-element-caption\"><em>Scotland\u2019s housing output is stalling (pic: DB Media Services)<\/em><\/figcaption><\/figure>\n<p class=\"has-medium-font-size wp-block-paragraph\">Low delivery of housing is at risk of becoming entrenched and undermining initiatives such as the new \u00a3100m fund to help first-time buyers.<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">Rising build costs and inflexible planning obligations mean that even sites with planning permission are no longer progressing because they cannot generate sufficient value to move forward.<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">New analysis from Savills shows that housing completions fell by 13% in 2025 to just 17,336 homes \u2013 the second lowest annual total since 2016 \u2013 highlighting a growing gap between housing need and delivery. <\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">The slowdown comes despite a slight recovery in planning applications, pointing to a fundamental issue: sites are entering the system but are increasingly unable to progress to construction.<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">Developers are now operating in what Savills describes as the most challenging conditions in decades. Under National Planning Framework 4 (NPF4), non-allocated sites continue to face significant barriers to securing planning permission \u2013 even in areas with clear and urgent housing need.<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">At the same time, delays to Local Development Plans \u2013 many not expected before 2030 \u2013 are placing increasing pressure on a shrinking pipeline of allocated, deliverable land.<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">The proposed creation of a national delivery body, More Homes Scotland, alongside targeted funding initiatives, provides some cause for optimism, says the report. However, it warns that without decisive action to address viability and planning barriers, Scotland\u2019s housing shortfall will continue to grow \u2013 at a time when new homes are needed more than ever.<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">Savills says the Scottish Government\u2019s recently introduced \u00a3100 million First Homes Fund, offering up to \u00a310,000 support for first-time buyers, is a welcome step in supporting demand. <\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">However, without a corresponding increase in supply, measures such as this risk being constrained by a lack of available homes.<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">Faisal Choudhry, head of residential research in Scotland at Savills, said: \u201cScotland is facing a clear mismatch between housing need and delivery. <\/p>\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" src=\"https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2025\/07\/Faisal-Choudhry.png\" alt=\"Faisal Choudhry\" class=\"wp-image-181646 lazyload\" style=\"aspect-ratio:1.4515606436980235;width:840px;height:auto\"\/><img loading=\"lazy\" decoding=\"async\" width=\"794\" height=\"547\" src=\"https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2025\/07\/Faisal-Choudhry.png\" alt=\"Faisal Choudhry\" class=\"wp-image-181646 lazyload\" style=\"aspect-ratio:1.4515606436980235;width:840px;height:auto\" srcset=\"https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2025\/07\/Faisal-Choudhry.png 794w, https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2025\/07\/Faisal-Choudhry-300x207.png 300w, https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2025\/07\/Faisal-Choudhry-768x529.png 768w, https:\/\/dailybusinessgroup.co.uk\/wp-content\/uploads\/2025\/07\/Faisal-Choudhry-600x413.png 600w\" sizes=\"(max-width: 794px) 100vw, 794px\"\/><figcaption class=\"wp-element-caption\"><em>Faisal Choudhry: Scotland is facing a mismatch<\/em><\/figcaption><\/figure>\n<p class=\"has-medium-font-size wp-block-paragraph\">\u201cCompletions have fallen sharply at a time when demand remains strong and the country is officially in a housing emergency.\u00a0 <\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">\u201cThe pipeline is becoming increasingly constrained, and without meaningful intervention, there is a real risk that under-delivery becomes entrenched over the coming years.\u201d<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">Ben Brough, head of development at Savills Scotland, added:\u00a0\u00a0\u201cWe are increasingly seeing consented sites stall because the numbers simply don\u2019t stack up. <\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">\u201cThe combination of build cost inflation, abnormal costs and fixed policy requirements is creating a viability gap that is too large to bridge. Without flexibility, fewer sites will come forward, and those that do will take longer to deliver \u2013 which only adds to the supply challenge.\u201d<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">Alongside viability, the planning system itself is a growing part of the challenge, says the report. While NPF4 has set out clear long-term ambitions, its implementation is creating delays and uncertainty at a critical time.<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">Requirements linked to design, infrastructure, climate mitigation and the \u2018Town Centre First\u2019 principle are increasing complexity, while decision-making times remain slow.<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">Alastair Wood, head of planning at Savills Scotland, said: \u201cThe ambition behind NPF4 is clear, but in practice the system is struggling to respond at the pace required to address Scotland\u2019s housing emergency.<\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">\u201cThe lack of up-to-date Local Development Plans, combined with increased policy complexity, is leading to delays and uncertainty \u2013 particularly for sites that could contribute to housing supply in the short term. <\/p>\n<p class=\"has-medium-font-size wp-block-paragraph\">\u201cA more flexible and proportionate approach to decision-making, particularly on viable and deliverable sites, will be essential if we are to accelerate housing delivery.\u201d<\/p>\n<p><!-- Simple Share Buttons Adder (8.5.5) simplesharebuttons.com -->           \t            <\/div>\n<p><script>\n!function(f,b,e,v,n,t,s)\n{if(f.fbq)return;n=f.fbq=function(){n.callMethod?\nn.callMethod.apply(n,arguments):n.queue.push(arguments)};\nif(!f._fbq)f._fbq=n;n.push=n;n.loaded=!0;n.version='2.0';\nn.queue=[];t=b.createElement(e);t.async=!0;\nt.src=v;s=b.getElementsByTagName(e)[0];\ns.parentNode.insertBefore(t,s)}(window,document,'script',\n'https:\/\/connect.facebook.net\/en_US\/fbevents.js');\n fbq('init', '1192059580980274'); \nfbq('track', 'PageView');\n<\/script>#housing #delivery #risks #entrenched #Daily #Business<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Scotland\u2019s housing output is s&hellip; <\/p>\n","protected":false},"author":1,"featured_media":31330,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[2],"tags":[266,265,4491,18189,18185,398,1448,18186,18187,18188],"_links":{"self":[{"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/posts\/31329"}],"collection":[{"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/microvibenews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=31329"}],"version-history":[{"count":0,"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/posts\/31329\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/microvibenews.com\/index.php?rest_route=\/wp\/v2\/media\/31330"}],"wp:attachment":[{"href":"https:\/\/microvibenews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=31329"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/microvibenews.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=31329"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/microvibenews.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=31329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}